Previous & current projects  
   
 
2014 - TB Wilbur repair and optimization of the propeller
 
2014 - TB Wilbur repair and optimization of the propeller
   
 
2014 - Command, OIM assignment on 7th Generation FPSO OSX-2
 
2014 - Tandem mooring VLCC-ULCC Front page - Knock Nevis at Maersk Field off Qatar.
   

Jan/2014 - Biggest asphalt carrier - repair at Tuzla
 
Oct/2013 - Conversion in China, Product Tanker to asphalt carrier
   

Managing and Supervision of crankshaft renewal, bed plate & engine block alignment checking, by optical method inline boring on Main Engine Sulzer, Stork-Wartsila TM410 at Brodosplit TDM doo - Split, Croatia. (photo) 
 
Managing and Supervision of crankshaft renewal, bed plate & engine block alignment checking, by optical method inline boring on Main Engine Pielstick PC 2.5 L 400 at Brodosplit TDM doo - Split, Croatia (photo)
   
 
Supervision on Oil Barge conversion at Nigeria, installation of self propulsion system HRP - Caterpillar (photo)
 
Supervision on Tugboat, gear box, reduction gear, propeller shaft repair (photo)
   
 
Supervisioning gear box renewal (Ghana PSC Shipyard)
 
Supervisioning propeller shaft replacement (Abidjan Shipyard)
   
   
 
Supervisioning new propeller shaft manufacturing (Abidjan Shipyard)
 
Supevisioning CPP overhauling/instalation (Ghana PSC Shipyard)
   

Supevisioning main engine - propulsion shaft alignment  
 
   

 

 

Home
Current projects and News
Services
Job opportunities
Contact and Support
All Rights Reserved.... MPSS 2014